And the second panel box before and after Pho

first_img And the second panel box, before and after. [Photo & text: sa] February 25, 2005 Continuation from 2/23 – Arcosanti site electrician Michael Bittman, aka Dr. Sparks, at the completed, well labeled wall panel. [Photo & text: sa] There are some exceptions to the electric lines connected to the public grid. A small solar plant in Unit 8, see installation of the supporting solar panel reported on 6/16/03, supplies power to Units 8, 9 and 10, as well as to the lighting of hallways and walkways all through the East Crescent. More of this on 3/2. [Photo & text: sa]last_img

admin

Leave a Reply

Your email address will not be published. Required fields are marked *